Here are some pics of the final project. We still have a few more items left to be done like getting the door to the pantry installed and getting some hardware in the 1/2 bath installed.
Wednesday, May 26, 2010
Tuesday, May 4, 2010
Week 10
Nothing much has been going on the last two weeks. They are waiting on the counter tops to come in before the can start installing the backsplash and the appliances. We have to push the end date to May 21st for various reasons.
Crown molding installed throughout the room - the wall color is Hot Spring Stones from Benjamin Moore
Refrigerator is almost there! The TV area is going to be painted a flat black.
View to the dining room (which is a big mess); The crown moldings made such a big difference in the room. It has a finished looked to it.
1/2 bath with Orange crackled tiles in a classic subway pattern. The floor from the kitchen is carried in to the 1/2 bath. The wall color is Desert Tan from Benjamin Moore
Another view of the paint color with the orange tiles
The tiles do not go all the way up to the ceiling
Subscribe to:
Posts (Atom)